Bula – The Ultimate Hobby House with a Massive Garage Workspace
Meet the Bula, a unique 2,632 sq. ft. residence designed for makers, tinkerers, collectors, and entrepreneurs who need more than just a home—they need a workspace that works as hard as they do. With a cozy 882 sq. ft. living area, 2 bedrooms, and a jaw-dropping 1,379 sq. ft. garage, this model is built for lifestyle flexibility and high-performance hobbies.
  • Oversized Garage Bay – 27' wide by 50' long with a soaring 15'5" ceiling, ideal for car lifts, boat storage, or full-scale workshop setups.
  • Commercial-Scale Access – Two 10' x 14' tall garage doors easily accommodate RVs, trailers, or even a semi-truck.
  • Comfortable Living Quarters – A functional 2-bedroom layout offers full-time or weekend-living capability.
  • Expansive Lanai (Porch) – 341 sq. ft. of covered outdoor space to relax, grill, or take a break from your projects.
  • Entry Space & Total Footprint – A welcoming 30 sq. ft. entryway and a total footprint of 2,632 sq. ft., blending utility with comfort.

Starting from $249,000, the Bula is ideal for:

  • Car and boat enthusiasts
  • Contractors and craftsmen
  • Home-based business owners
  • Snowbirds needing winter RV storage and living

With the Bula, your garage isn’t just an afterthought—it’s the heart of your home.

Home Size
Living
Entry
Porch
Garage
882 sq.ft
30 sq.ft
341 sq.ft
1379 sq.ft
TOTAL:
2632 sq.ft
COST:
from $249,000
Construction Milestones
Pre-Construction Phase (0.5 Month)
✅ Free Consultation – Discuss your vision and project requirements
✅ Floorplan Selection – Choose the ideal floor plan
✅ Cost Estimate – Get an approximate budget
✅ Contract – Once finalized, we move forward
Site Development & Foundation (2 Months)
✅ Site Survey, Blueprint & Site Plan – Preparing for construction
✅ Engineering & Permitting – Obtaining necessary approvals
✅ Site Clearing & Grading – Preparing the lot for building
✅ Underground Utilities & Plumbing – Setting up essential infrastructure
✅ Foundation & Slab Pouring – Laying a solid base for your home
Structural Framing & Rough-In (2 Month)
✅ Framing – Block Walls. Trusses. Interior Framing
✅ Weatherproofing – Peel & Stick waterproofing
✅ Rough-In Installations – HVAC. Plumbing. Electrical Wiring
Exterior & Enclosure Phase (1.5 Month)
✅ Windows, Doors, and Sliders Installation
✅ Insulation for Energy Efficiency
✅ Exterior Work – Drywall & Stucco. Roof Shingles.
Interior Finishing & Mechanical Systems (1.5 Month)
✅ Utility Connections – Septic & Well. Culvert Pipe for Drainage
✅ Interior & Exterior Painting
✅ Cabinet Installation & Flooring Prep
Final Finishes & Walkthrough (1.5 Months)
✅ Final Installations – Tile & Vinyl Flooring. Garage Door Installation
✅ Mechanical System Completion – HVAC, Plumbing & Electrical Finalization
✅ Exterior Completion – Driveway & Landscaping
✅ Final Inspections & Certificate of Occupancy

🏡 You Receive the Keys!
Once all inspections are complete and approvals are secured, your new home is ready for move-in!