The CAMPBELL

Campbell – The Ultimate House with a Massive Garage Workspace
Meet the Campbell, a unique 3,276 sq. ft. residence designed for makers, tinkerers, collectors, and entrepreneurs who need more than just a home—they need a workspace that works as hard as they do. With a cozy 1692 sq. ft. living area, 3 bedrooms, and a jaw-dropping 1,548 sq. ft. garage, this model is built for lifestyle flexibility and high-performance hobbies.
  • Oversized Garage Bay – 29' wide by 54' long with a soaring 15'5" ceiling, ideal for car lifts, boat storage, or full-scale workshop setups.
  • Commercial-Scale Access – Two 10' x 14' tall garage doors easily accommodate RVs, trailers, or even a semi-truck.
  • Comfortable Living Quarters – A functional 3-bedroom layout offers full-time or weekend-living capability.
  • Entry Space & Total Footprint – A welcoming 36 sq. ft. entryway and a total footprint of 3,276 sq. ft., blending utility with comfort.

Starting from $399,000, the Campbell is ideal for:

  • Car and boat enthusiasts
  • Contractors and craftsmen
  • Home-based business owners
  • Snowbirds needing winter RV storage and living
Home Size
Living
Entry
Garage
1692 sq.ft
36 sq.ft
1548 sq.ft
TOTAL:
3276 sq.ft
COST:
from $399,000
Construction Milestones
Pre-Construction Phase (0.5 Month)
Free Consultation – Discuss your vision and project requirements
Floorplan Selection – Choose the ideal floor plan
Cost Estimate – Get an approximate budget
Contract – Once finalized, we move forward
Site Development & Foundation (2 Months)
Site Survey, Blueprint & Site Plan – Preparing for construction
Engineering & Permitting – Obtaining necessary approvals
Site Clearing & Grading – Preparing the lot for building
Underground Utilities & Plumbing – Setting up essential infrastructure
Foundation & Slab Pouring – Laying a solid base for your home
Structural Framing & Rough-In (2 Month)
Framing – Block Walls. Trusses. Interior Framing
Weatherproofing – Peel & Stick waterproofing
Rough-In Installations – HVAC. Plumbing. Electrical Wiring
Exterior & Enclosure Phase (1.5 Month)
Windows, Doors, and Sliders Installation
Insulation for Energy Efficiency
Exterior Work – Drywall & Stucco. Roof Shingles.
Interior Finishing & Mechanical Systems (1.5 Month)
Utility Connections – Septic & Well. Culvert Pipe for Drainage
Interior & Exterior Painting
Cabinet Installation & Flooring Prep
Final Finishes & Walkthrough (1.5 Months)
Final Installations – Tile & Vinyl Flooring. Garage Door Installation
Mechanical System Completion – HVAC, Plumbing & Electrical Finalization
Exterior Completion – Driveway & Landscaping
Final Inspections & Certificate of Occupancy

🏡 You Receive the Keys!
Once all inspections are complete and approvals are secured, your new home is ready for move-in!